Center for Environmental Excellence by AASHTO CENTER HOME  
skip navigation
CEE by AASHTO Home | Compendium Home | Online Compendium Help | Recent Updates | Inquiries | FAQs | State DOT Links
About Best Practices | Comment on Best Practices | Suggest A Best Practice | Volunteer to Vet Best Practices
Printer Friendly Version Print This Page    
 
« Back to Chapter 10 | Go to Chapter 1 »
Chapter 11
Appendix
11.23. NYSDOT Construction/Environmental Training Schedule

Table 28 : NYSDOT Construction Environmental Sample Training Schedule

Region

Topic(s)

Presenter(s)

Audience(#)

Date(s)

1a.

Environmental and Landscape Permits, Issues and Practices - SEQR, Wetlands, SPDES, ECOPAC, Tree Preservation, Landscaping Enhancements

D. Hitt, D. Goetke, M. Manosh, R. Ambuske, D. Graves , C. Schleede

EICs

1/28/03

2a.

General Environmental Awareness, West Nile , SPDES, Waste Areas

E. Warner, E. Frantz, DEC

Winter Construction Meeting ( 80 )

3/12/03

3a.

 

Erosion and Sediment Control, Tank Removal, Haz Waste, Asbestos, ECOPAC, SPDES, Waste Areas, Lead Paint ( 7.5 hrs )

R. Steele, C. Anderson, H. Koslowsky

Construction Staff and Contractors ( 25 )

2/10/03 3/10/03 4/10/03 4/25/03

3b.

 

Erosion and Sediment Control, SPDES, Waste Areas ( 1 hr )

R. Steele

Contractors ( 50 )

3/14/03

3c.

 

Haz Waste ( 1 hr )

R. Steele, M. Brophy

Bainbridge Residency ( 20 )

3/18/03

 

3d.

 

Hazcom for NYSDOT ( 1 hr )

R. Steele

 

 

March

 

4a .

 

Disposal of Surplus Material-BMPs ( 1 hr )

T. Martin

AGC/DOT Conference ( 50 )

12/11/02

 

4b .

 

Disposal of Surplus Material-BMPs ( 1 hr )

T. Martin

MEC/CEC Statewide Meeting ( 60 )

1/17/03

4c .

 

Disposal of Surplus Material-BMPs ( 1 hr )

T. Martin

New EIC Training ( 40 )

2/7/03

4d .

 

SPDES, Section 209 ( 1 hr )

T. Martin

EIC/Field Staff Winter Training ( 100 )

2/26/03

4e .

 

Solid and Haz Waste Regs ( 30 min )

T. Martin

 

LAB/EAB Conference ( 25

3/6/03

4f .

 

Haz Waste Manifests ( 45 min )

T. Martin

EIC/Field Staff Winter Training ( 55 )

3/13/03

5a .

Environmental Ethic, Wetlands, Streams, Water Quality, MBTA, Erosion and Sediment Control, Cultural resources, Asbestos, Noise, Air Quality, Trees & Planting, Curb, Ramps, Pedestrians

Shepherd, NYSDEC, Wheeler, Jones, Kluck, Christner, Tackley

Construction Inspectors School ( 75 )

2/10/03 2/18/03 2/28/03

5b .

Same as above with emphasis on E&SC and Contractor Responsibilities

J. Shepherd

Contractor ( 20 )

2/27/03

5c .

Same

J. Shepherd

EIC Annual Training ( 55 )

3/13/03

6

SPDES Phase 2 Construction Permit ( At So. Tier Reg Planning Board Conference )

T. Markel, NYSDEC

Town Highway Superintendent

4/10/03

8a-c

 

Erosion and Sediment Control, SPDES, 209 Revisions ( 2 hr )

J. Ayers, J. Fogietta

EICs and Inspectors ( 100

1/28, 29 & 30/03

8d-g

 

Erosion and Sediment Control ( 1 hr )

J. Ayers, S. Davis

Residency Maintenance Staff ( 110 )

2/24-27

10

Environmental Awareness, SPDES, Erosion and Sediment Control, etc

L. Star

EIC Annual Mtg ( 45 )

2/4/03

 

< back to top >
 
Continue to Section 11.24 »
 
Table of Contents
 
Chapter 11
Appendix
11.1 Florida DOT Environmental Policy 11-1
11.2 Kentucky Transportation Cabinet Environmental Policy 11-1
11.3 Maine Dot Environmental Policy 11-2
11.4 North Carolina DOT Environmental Stewardship Policy 11-3
11.5 PennDOT’s Green Plan Policy Statement 11-3
11.6 Washington State Dot Environmental Policy 11-4
11.7 New South Wales Roads and Traffic Authority Environmental Policy 11-4
11.8 Texas Environmental Commitment Checklist 11-5
11.9 Maine DOT Environmental and Safety Auditing Policy and Procedure 11-11
11.10 Maine DOT Corrective Action Request Form 11-14
11.11 Mass Highway Compliance Tracking Methods 11-15
11.12 Mass Highway Compliance Tracking Roles and Responsibilities 11-16
11.13 Mass Highway Self-Audit Procedure 11-17
11.14 Mass Highway Facility Self-Audit Checklist 11-18
11.15 Mass Highway Environmental Roles & Responsibilities 11-20
11.16 Mass Highway Environmental Section EMS Roles and Responsibilities 11-20
11.17 Mass Highway Operations Division EMS Roles and Responsibilities 11-22
11.18 Mass Highway District EMS Roles and Responsibilities 11-23
11.19 Mass Highway Training Expectations By Role 11-24
11.20 Mass Highway Environmental Training Program Roles and Responsibilities 11-25
11.21 PennDOT District 10 SEMP Responsibility Table 11-26
11.22 PennDOT District 10 SEMP Training Table 11-28
11.23 NYSDOT Construction/Environmental Training Schedule 11-29
11.24 Environmental Checklist for MoDOT Facilities 11-30
11.25 PennDOT Stockpile Quality Assurance Responsibilities 11-33
11.26 PennDOT 15-Minute Stockpile Walkaround 11-34
11.27 PennDOT Stockpile Snapshot 11-34
11.28 PennDOT Maintenance Stockpile Activity Protocol 11-35
11.29 PennDOT Post-Storm Salt Management Tracking Responsibilities 11-41
11.30 Risk, Compliance Issues, and Management Examples for Highway-Generated Waste - Oregon DOT 11-42
11.31 NYSDOT-DEC Deer Carcass Composting – Practice Guidelines 11-43
11.32 NYSDOT’s Draft Metric for Assessing Performance of Integrated Vegetation Management on ROW 11-47
11.33 NCDOT Roadside Vegetation Management Guidelines in Marked Areas 11-50
11.34 Invasive Species Coordination and Control DOT Resources
   
Lists: Examples | Tables | Figures
Website Problems Report content errors and/or website problems
PDF Document Download Adobe Acrobat Reader