Center for Environmental Excellence by AASHTO
skip navigation
CEE by AASHTO Home | Wildlife & Roads Mission | Project Team | Publications | Press | Photo Gallery | Contact Wildlife & Roads
Wildlife & Roads
Printer Friendly Version Print This Page    
 
Decision Guide

Step 2: Identify Solutions & Options

2.3 Determine Configuration

Determine configuration requirements for mitigation including dimensions, materials, bottom surface, lighting, noise considerations, human use, and engineering requirements: In this step the user will work through the ecological and engineering requirements of creating the mitigation.

2.3.1 Refer to Recommendations for Configurations
for Target Species

2.3.2 Identify Configuration Needs for Dual Purposes

2.3.3 Work with Engineers on Structural and Cost Constraints

2.3.4 Determine Final Mitigation Configurations

 
Decision Guide Site Map
Step-by-Step Decision Guide Graphic
 
Step 2: Identify Solutions & Options
2.0 Overview
2.1 Select General Mitigation Type
2.2 Determine Placement
2.3 Determine Configuration
2.4 Determine Maintenance Needs
2.5 Estimate Cost Effectiveness
2.6 Determine Monitoring & Evaluation Plan
PDF Document View Wildlife and Roads NCHRP 25-27 Final Report
   
Website Problems Report content errors and/or website problems
PDF Document Download Adobe Acrobat Reader