Case Law Updates on the Environment (CLUE)

Case Law Update Details

Case Title

Friends of Capital Crescent Trail v. FTA

Case No.

877 F.3d 1051

Court

U.S. Court of Appeals - D.C. Circuit

State

Maryland

Date

12/19/2017

Project

Purple Line

Project Type

Transit

Project Description

The Purple Line is a 16.2-mile light rail transit project in the Maryland suburbs of Washington, D.C. The project will provide east-west transit service connecting several major activity centers, including two employment hubs and the state’s flagship university campus. It would also provide connections to four stations on the region’s Metrorail subway system.
The NEPA process for the Purple Line began in 2003. Both MTA and FTA issued a Draft EIS in 2008, examining eight alternatives. The state identified light rail as its “locally preferred alternative” in mid-2009. FTA and MTA issued a Final EIS in 2012, comparing the light rail alternative and a No Action alternative. FTA issued a Record of Decision approving the light rail project in March 2014.

Following the Record of Decision, the state entered into a public-private partnership agreement with a developer team, under which the developer is responsible for completing the design, financing and building the project, and then operating and maintaining the project for 30 years.

Case Summary

Plaintiffs—an environmental organization and two individuals—challenged the Record of Decision in August 2014, bringing claims under NEPA, the Endangered Species Act, the Migratory Bird Treaty Act, Section 4(f) of the U.S. Department of Transportation Act and other laws. Plaintiffs later filed two amended complaints claiming that FTA was required to prepare a Supplemental EIS based on various design changes to the project and other new information, including the potential effects of declining Metrorail ridership on Purple Line ridership forecasts.

In August 2016, the district court ruled that FTA should have prepared a Supplemental EIS on the Metrorail ridership issue and vacated the March 2014 Record of Decision on that basis. The district court reserved judgment on all other issues. With the court’s permission, MTA and FTA submitted an additional analysis of the Metrorail ridership issue. This analysis examined five hypothetical scenarios involving varying degrees of Metrorail ridership decline, each with a corresponding decline in Purple Line ridership. The agencies found that under any of those scenarios, the Purple Line’s direct environmental impacts would remain the same, and its operating impacts may be slightly reduced. The agencies also found that the Purple Line would still meet its purpose and need, even at lower ridership levels, and found that any changes in ridership would not alter the underlying basis for selecting light rail over other modes.

In May 2017, after considering this additional analysis, the district court again held that a Supplemental EIS was needed on the Metrorail ridership issue. Shortly thereafter, the district court ruled in favor of MTA and FTA on all other issues.

In June 2017, MTA appealed the district court’s decision on the Metrorail issues and sought a stay of the district court’s decision. FTA also appealed, and plaintiffs cross-appealed. On July 19, 2017, the D.C. Circuit granted MTA’s motion for a stay pending appeal, thereby reinstating the Record of Decision and allowing construction to begin. The D.C. Circuit issued its opinion on the merits on December 19, 2017, ruling in favor of MTA and FTA on all issues.

Key Holdings

NEPA

Supplemental EIS – New Information regarding Purpose and Need.  The plaintiffs claimed that FTA, in deciding not to prepare a Supplemental EIS, had incorrectly assumed that a Supplemental EIS is only required when new information changes the environmental impacts of the project.  The court found that FTA had, in fact considered whether the new information about Metrorail ridership would alter the Purple Line’s ability to meet its purpose and need or the basis for selecting light rail by considering five scenarios involving various declines in Metrorail ridership, and had reasonably found that even if Metrorail ridership did decline, the Purple Line project would still meet its purpose and need.   The court also rejected plaintiffs’ attempt to rely on subtle differences in wording between provisions in the CEQ regulations and FTA’s own regulations regarding the standard for preparing a Supplemental EIS. The court held that, regardless of which regulations are applied, a Supplemental EIS is required only if the new information presents a “seriously different picture of the environmental landscape.”  The court also noted that such decisions “implicate substantial agency expertise” and thus are entitled to deference.   Lastly, the court also rejected Plaintiffs’ argument that FTA and MTA had not responded sufficiently to criticisms of the agencies’ ridership forecasts, holding that “[a]gencies are not always required to give ‘point-by-point responses’ to every objection raised.”

Range of Alternatives.  The plaintiffs claimed that the range of alternatives in the Final EIS was too narrow because the only alternatives considered in detail in that document were the state’s locally preferred alternative—the light rail transit project—and the No Action alternative. They claimed that the Final EIS should have fully reexamined all eight of the alternatives that had been studied in detail in the Draft EIS, rather than summarizing that analysis and incorporating it by reference.  The court noted that, under FTA’s New Starts process, it was the state’s responsibility to select a locally preferred alternative—and once it had done so, that choice “narrowed FTA’s role” to deciding whether to approve that alternative.  Given that statutory scheme, the court found it was permissible for the Final EIS to focus on comparing the state’s preferred alternative to No Action. The court explained that:

“This ‘funneling approach’ adopted by Maryland and FTA, narrowing alternatives over a period of years, was in accord with NEPA’s “rule of reason” ... and common sense: Agencies need not reanalyze alternatives previously rejected, particularly when an earlier analysis of numerous reasonable alternatives was incorporated into the final analysis and the agency has considered and responded to public comment favoring other alternatives. .... Requiring more detail on rejected alternatives would elevate form over function.”

Indirect Effects – Level of Detail.  The plaintiffs claimed that FTA and MTA had not adequately examined the potential indirect effects resulting from induced growth, particularly around transit stations; they claimed that additional development could increase stormwater run-off and adversely affect low-income and minority populations. The court noted that the required indirect effects analysis in a NEPA document is “limited to what is reasonably foreseeable, with reasonable being the operative word.”  By contrast to cases requiring a quantitative analysis of GHG emissions as indirect effects, the court found in this case “[l]ocal land use planning documents are inherently less concrete than numerical estimates” of the GHG emissions from an oil pipeline.  Given these factual distinctions, the court concluded that it was sufficient for FTA and MTA to address induced growth qualitatively.

Mitigation – Change in FEIS Commitment.  The plaintiffs claimed that a Supplemental EIS was required because MTA had decided, after completing the NEPA process, to allow the project developer the flexibility to determine appropriate stormwater mitigation through the state’s permitting process, rather than specifically requiring the contractor to use “green track”—a vegetated track-bed that would help to limit stormwater run-off.  The court rejected this claim, finding that “although breaking a promise to use green track mitigation may present a political issue, the Friends fail to show the change is legally significant enough to require preparation of an SEIS.”  In reaching this conclusion, the court relied on a technical report prepared by MTA, which showed that the same state stormwater management regulations will apply regardless of whether green track or another stormwater mitigation measure is used, such that the elimination of green track would not change the project’s effects on stormwater.